The Wentworth to Broken Hill Pipeline was an initiative by the NSW State Government to supply Broken Hill with 37.4 megalitres of raw water per day via a 270km pipeline from the River Murray near Wentworth.

Broken Hill and surrounding communities had suffered from significant water shortages for too long. The NSW Government identified the $467 million Wentworth to Broken Hill pipeline as the best solution as it would provide the most reliable long-term water supply sourced from the River Murray.

Constructing the 270km pipeline required over 2300 truckloads to deliver the pipes along the pipeline route with 1473 loads from Melbourne and 842 loads from Perth. 

A majority of the buried pipeline runs adjacent to the Silver City Highway, with the last six kilometres running under the streets of Broken Hill until reaching the Mica Street Water Treatment Plant.

The pipeline requires four pumping stations which were constructed along the route, as well as a 720 megalitre bulk water storage facility 25 kilometres south of Broken Hill. 

Our team is managing the operations and maintenance of the pipeline for up to 20 years with our partner, TRILITY. 

Customer
WaterNSW
Location
Broken Hill, New South Wales
Specialisation
Water & wastewater
Start
January 2018
End
Late 2018
An excavator and trenching machine dig a deep trench in red soil beside a length of pipe.
An excavator lifts a long black pipe into position across red outback soil as a worker watches.
Rows of black pipeline sections laid out on red earth beside a dirt road and traffic sign.
01/03
Black pipe sections lined up along a cleared strip of red soil as a worker walks beside them.

This project brought immediate benefits to both Wentworth and Broken Hill. Over 150 local people contributed to workforce which reached a peak of over 500 workers during construction.

A large pipe lies in a deep trench as an excavator and truck work alongside the pipeline route.

This project brought immediate benefits to both Wentworth and Broken Hill. Over 150 local people contributed to workforce which reached a peak of over 500 workers during construction.

A worker in orange high-visibility clothing places concrete as an excavator works alongside.
Stacks of black pipes on red earth under a wide sky filled with clouds.

Broken Hill and Wentworth based companies supplied almost $50 million in goods and services to the project.