A significant upgrade to north-west Tasmania’s power grid.

Palmerston to George Town High Voltage Transmission Lines

The Palmerston - Hadspen - George Town optical ground wire installation project involved upgrading 85 kilometres of existing 220kV transmission line infrastructure between Palmerston and George Town in Tasmania.

The project extended over 100 road crossings, eight major highway crossings, four rail line crossings and eight river crossings, including the Tamar River alongside the Batman Bridge. Works were also carried out over the Cataract Gorge, Batman Bridge and through the Trevallyn Nature Reserve.

The project scope included tower strengthening (installation of new steel), assembly and helicopter installation of new earth peaks and stringing new Optical Ground Wire (OPGW). The 85- kilometre line included 243 tower structures and three substations. Most works were conducted under live conditions with only a select few stringing pulls conducted under outage conditions.

Customer
Transend Networks Pty Ltd
Location
Launceston, Tasmania
Specialisation
Energy & renewables
Start
September 2012
End
March 2014
Workers on a lattice transmission tower being assembled among tall eucalypt forest on a hillside.

The project was completed three months ahead of schedule, despite several engineering, extreme wet weather and project management challenges.

Worker in a hard hat and harness climbing a steel transmission tower against a blue sky.

Our team developed of a number of innovations, including a bespoke tower foundation upgrade solution and a new method of stringing towers. The first innovation “overlay type” tower foundation provided a much more aesthetic solution than traditional concrete structures and was more appealing to landowners.

Two workers in high-visibility gear on a steel lattice tower above dense bushland, with lines strung across.
Helicopter flying above high voltage transmission towers and lines across a rural hillside.

The new method for stringing towers allowed the high voltage power rope to be pulled through the centre of the tower, reducing the need of double handling, resulting in a safer and more efficient end-product. This initiative resulted in significant immediate cost reductions and has been adopted for future use on transmission lines throughout Tasmania.