Skip to content
Rail crew in high-visibility workwear beside a large tractor on red earth under a bright sun.

On track in the Pilbara.

Eliwana Rail Project for Fortescue Metal Group

Our team secured a $130 million contract with Fortescue Metals Group to construct 143 km of railway tracks and signalling at its Eliwana iron ore project in the Pilbara of Western Australia.

This greenfield project connected the new Eliwana iron ore mine to the existing Fortescue Hammersley Line.

Our team constructed 143kms of heavy haul track in the Pilbara, extended the existing signalling and train control systems, and completed a traffic capacity extension to the communication infrastructure as part of the integrated package for trackworks, train control and signalling systems (ITCS).  

Our team managed the design, construction and integration of signalling and train control systems for the connection of the new Eliwana Rail Line to the existing Fortescue Hamersley Line to Port Headland. We were awarded further works including CCTV camera installations, design and construction of a new active level crossing and an extension to the ITCS contract for the remainder of the Eliwana Railway.

Customer
Fortescue Metal Group
Location
Pilbara, Western Australia
Start
2020
End
2021
Yellow John Holland rail vehicle on the track with a John Holland ute parked beside it on red earth.
Close-up of new rail fastened to concrete sleepers on a red earth formation.
Locomotive under a loading tower on new track, with a worker standing beside the line.
Track-laying machines lined up on the new line at sunset, on fresh ballast.
New rail track on ballast beside site huts and a communications tower, with hills behind.
01/05
Workers in high-visibility gear on a red embankment beside a track-laying machine under blue sky.

The project was completed on time despite challenging weather and access conditions.

Along with our other Western Australian projects, we recruited 400 new workers.

Large group of workers in high-visibility workwear and hard hats posing beside the new track.
Six workers in hard hats and high-visibility shirts standing on the track inside a loading structure.

“Working in a remote and often volatile environment has its challenges, but I am proud that the team were able to demonstrate our capability to manage complex logistics and high-production welding facilities while enabling efficient project delivery.” John Holland Rail Delivery Manager, John Ma