Batemans Bay Bridge

A much-needed new bridge over the Clyde river in Batemans Bay.

The new bridge has improved connectivity in and around Batemans Bay for emergency services, motorists, freight, pedestrians and cyclists. Importantly the new bridge height allows for uninterrupted access for boats up to 12 metres.

The scope included the construction of a new four-lane bridge and demolition of the old bridge in a high-risk marine park environment and close proximity to the thriving local oyster industry. 

After two years, two COVID lockdowns, two significant flood events and the state’s worst ever bushfires, the bridge fully opened ahead of schedule in September 2021. 

Customer
Transport for NSW
Location
Batemans Bay, New South Wales
Specialisation
Roads & bridges
Start
2019-06-01
End
2022-10-01
Crowds walking across the new Batemans Bay Bridge deck beside the old bridge, seen from above.
New bridge deck carrying traffic past the steel lift towers of the old bridge, seen from above.
01/02
Road leading towards the old lift bridge, with a guardrail in the foreground and the sun behind trees.

The original 65-year old bridge was dismantled and parts were used for an art installation on the river foreshore.

Wide aerial view over the bay to the new and old bridges, with moored yachts and hills behind.

Before the bridge was opened to traffic, a community event was held where around 3,000 locals walked across the new bridge to mark the occasion.

People gathered on the bridge deck for a ceremony, beside an NSW Government Batemans Bay Bridge banner.
Aerial view of the new bridge approach and interchange, with people walking on the deck by the river.

The bridge includes 30,000 tonnes of concrete, 2,700 tonnes of Australian made reinforcing steel and there were 166 bridge segments manufactured on site to construct the bridge.